10-4 Sweeper. I don't know who that Charter tech was, but he is full of shit. They teach all their techs to use the gb. Almost every installer I have ever known that worked for Charter (inhouse) is required to pass the basic NCTI installer course and adhere to those standards.
This is CABL.com posting #279016. Tiny Link: cabl.co/mbkKq