He didn't even need a drill. the AO I put the EMTA on was pretty much already there. Ran it from the next room going wallplate to wallplate. I used a screw driver. Levels are better now too, not going through an 8-way anymore.
This is CABL.com posting #182004. Tiny Link: cabl.co/mVvI