Re: MDU plant bidding


Will your customer let you line item the bid or do they want a composite price? If line item is allowed good for you. Try to think of every step you wil have to do. Will you subcontract out the floor bores? Will yu have to have them XRayed before cutting the floor. Will the customer supply all materials, if not which do you have to come up with. What is your mark up on materials? How difficult will it be for you and your crews to get into the site? Any time restrictions?
It would be very easy to say that you should be able to do the job for about $3.00 to 3.50 a foot, but there are to many unkowns that you have not mentioned.

> Need some Ideas on how much to bid for running plant inside of building for a 400 outlet MDU project.
>
> Outlets will be billed seperatley.
>
> Description follows;
>
> Run aprox 350ft. to first tap location then carry plant straight up 7 floors with a tap location on each floor. about 150ft. will be exposed and have to be put in emt conduit.
>
> The project is still about 3 months out and has'nt even been designed yet I was just asked for a preliminary bid.
>
This is CABL.com posting #73856. Tiny Link: cabl.co/mtno
Posted in reply to: MDU plant bidding by cablguy2002
There is 1 reply to this message
Re: MDU plant bidding johntech 6/20/2002 2:30:00 PM