Hello,
I have 2 sites that have some pretty thick soil. I need to go down about 6 inches. This is for running coax and I will be dropping conduit in the trench to be reburried. One site needs about 75' of trenching and the other about 200 ft. Normally I would just use a shovel, but I also don't like wasting too much time digging. The site is remote and I don't have to worry about any utilities. Funds are very limited for this project. The trench will be about a foot from the cliff to the river 75- 100 ft below.
Any advice would be greatly appreciated.
Thanks,
Mike
Trenching
There are 3 replies to this message