In the 11 years I've been doing this, we have always billed for trench or strand footage plus an add on for every storage loop. Only once have I worked on a sheath footage job, in the end it paid less than linear footage plus storage.
This is CABL.com posting #266523. Tiny Link: cabl.co/mbhuV