If you placed it in the Keys for Consolidated Line then I spliced it.
If you pulled it through the existing duct banks in the bridges that
gave so much trouble I am the one who came up with the sub-
duct sleeve idea.
I now own my own company and am certified up to transmission.
Splice for many utilities have South Carolina Mechanical Contractors
license EL4 M104137 Electrical and South Carolina General Contractors
license 2U4 G111883 Public Utilities Electrical. I am the qualifier for both
and like you have been doing this a long time.
Re: how do i get a Power Zone certificate forr add
There is 1 reply to this message