If they bought the materials. billed you for the materials that were actually used, then the rest belongs to them and .50 might be alright if you are willing to pay it. but if they turned in receipts for all of the materials (and you paid them) it already belongs to you
This is CABL.com posting #233834. Tiny Link: cabl.co/m8ZG