Create your free account now! Sign up

Re: driveway bore gone bad


I wont argue that point with you but you can only go out so far. I have only worked in Upstate NY... Nothing but rock, most driveways have 8 to 10 inches of Bank run gravel under them. We try and start out at 18 to 20 inches our Minimum cover, but when you get up against a rock it doesn't leave much room for error.
The Roto is more accurate than the mole but it still leaves a lot to be desired.
I have bored 40' roads and come out within inches of the same depth I started. I have also bored 12' driveways and come out several feet below the starting point.
This is CABL.com posting #228756. Tiny Link: cabl.co/m7FM
Posted in reply to: Re: driveway bore gone bad by Hybrid.PC
There is 1 reply to this message
Re: driveway bore gone bad joeatstellar 10/11/2008 10:24:00 PM