I am being told that Dish network is requiring the static ground
to be attached to the dish with a ground lug bolted to the elevation slots. Paint must be removed and self tapping screws are unacceptable.
Is this change nationwide or just in my little side of hell?
Thanks in advance
Dish network Grounding protocols
There are 2 replies to this message