Re: Work Done By Baileys Satellite
Member #: 40596
Registered: 9/12/2005
Posted:
532
Name:
James Youngman
Name:
James Youngman
Company:
Youngman Satellite Service
Occupation:
Contractor
Location:
Memphis, TN
Experience:
~40 years
Huh...? That is plenum cable past the ground block and that is UV rated quad shielded 6...This is on a roof, being secured to a walkway from two levels. The ground is right underneath the block, with-in 3 foot, connected with clamp @ ac unit conduit. Nail me for those ties wraps I suppose...I wasn't gloating.
This is CABL.com posting #211367. Tiny Link: cabl.co/m29j
Posted in reply to: Re: Work Done By Baileys Satellite by TCC1
There are 0 replies to this message