Create your free account now! Sign up

Re: Work Done By Baileys Satellite


Actually he forgot the zip tie that is holding his "service loops".

Being an outdoor enviroment he should probably be using UV rated cable and dress them down the pole so they are not swing in the breeze.

try permanently securing the ground block- not zip ties

and do something with that ground wire.
This is CABL.com posting #211358. Tiny Link: cabl.co/m29a
Posted in reply to: Re: Work Done By Baileys Satellite by 1brikshyvtwin
There are 2 replies to this message
Re: Work Done By Baileys Satellite jamest 2/17/2008 12:44:00 PM
Re: Work Done By Baileys Satellite SATMAN/MEMPHIS 2/17/2008 11:47:00 AM