Every pole I do gets 1 full bag of fast set quick crete (the red bag) pole and concrete cost me 12 bucks and i charge the customer$25.00 it takes a whole 5-10 minutes I do not like anyone to tell me my pole turns( flatten 1 end and drive a small spike through the end) that way it wont turn in the concrete) just the way I do my job
This is CABL.com posting #164288. Tiny Link: cabl.co/mQTY