it all comes down to the install supervisor. I worked for OCI down here, and it was known that neither the prime or the mso could hire a tech from each other without a 6 month waiting period. I can name at least 2 contractors who were hired directly from the prime. can you say favortism?
This is CABL.com posting #151961. Tiny Link: cabl.co/mNG9