Thanks for the clarification on what that was. I wasnt sure but I thought it was from dish network. Wouldnt you want to install your ground blocks before that switch or does that matter? I know the switch is bonded to the ground block, but those are placed after the switch it doesnt seem as affective. It would seem logical to bond it before the switch instead of back feeding it.
This is CABL.com posting #141150. Tiny Link: cabl.co/mKSM