Again new2cable, depending on the current condition of the plant and the proper/improper splicing at the time of the initial build and maintenance performed will dictate what you need to do.
I assume that you probebly have an existing "trunk and feeder" technology design and are going to randomly drop in new fiber nodes for a cascade reduction and turn some existing amplifiers around for maximum penatration.
Please feel free to call me on my cellular and we can discuss specifics. The world of return can't be put in few words over the BAR. I would be happy to assist.
Greg Tobin
(-REDACTED-)
(314) 422-4423 cellular
Re: feed thru connectors used in reverse system
There are 0 replies to this message