Create your free account now! Sign up

$4K + WEEKLY UP TO 200 PER INSTALL 4-6 JOBS A DAY

Independent Contractor


Oregon

Bonanza

Job Description

**STIMULUS CREWS NEEDED NOW — BONANZA, OR**
Drop replacement & installations.
**$150- $250 per install when you use Stackable codes · Paid weekly · Training provided · Permanent markets**

**What you bring:** Fusion splicer and cleaver with your own consumables · Truck or van rated to carry a 28 ft ladder · Full PPE (hard hat, vest, safety glasses, gloves, boots) · Hammer drill, hand tools, power meter and light source

**What we provide:**
• **Permanent markets** — ongoing, long-term work, not a short build that ends in a few weeks
• **Training provided** — classroom and field training on our install, splice, drop and restoration standards
• **$150 per install** — Stimulus full install with drop ready. Drops, splice and test, trouble calls and restoration pay on their own units
• **Paid weekly** — 1099 subcontractor, paid per completed unit on the HTSAL rate card

**Stimulus: drops and restoration pay on top.** Buried drop to 300 ft pays $130.82, plus $2.47 a foot beyond 300 ft. Aerial drop pays $91.33 for the first span and $66.64 each additional span. Concrete and asphalt restoration pay per square foot, and cobble, hard soil and extra depth all carry their own adders.



**Apply:** Both rate cards are posted at **https://htsalfiberoptics.com/#apply** — see what every unit pays before you commit. Tell us which market you want, where you're based, your years of fiber experience, and the equipment you own.


*Independent contractors only (1099); responsible for their own tools, vehicle, insurance and taxes. Pay is per completed unit, issued weekly, and subject to units being accepted by the prime contractor.*

Contact

Apply online https://htsalfiberoptics.com/#apply or text (929) 598-8877

Please Login to use the Contact form.

About Us

**ALSO HIRING — FRONTIER FTTP, 11 openings across 6 states.** Separate rate card, separate markets — residential installs, reconnects, aerial and underground drops, splice drops, ONT and set-top work, trouble tickets. These are permanent markets. Top producers on Frontier volume run $10,000–$13,000 a month, paid out weekly.

| State | Market | Work type | Openings |
|---|---|---|---|
| MN | Fairmount RC | Fiber | 1 |
| OH | Cambridge RC | Fiber | 1 |
| OH | Brookeville RC | Fiber | 2 |
| SC | Myrtle Beach RC | Fiber | 1 |
| SC | Simpsonville RC | Fiber | 1 |
| WI | Plymouth RC | Fiber | 1 |
| WI | Door County RC | Combo (fiber + copper) | 1 |
| WV | Hundred RC | Copper | 2 |
| WV | Petersburg RC | Fiber | 1 |

listed • expires
job listing #129781 • tiny link cabl.co/eHVp