Create your free account now! Sign up

Drop bury techs

Independent Contractor


Minnesota

Starts

Asap

Pay

$110 direct bury /$5 ft bore (sidewalks or driveways) with own truck and equipment.

Job Description

Drops or all prebury no splicing . This is a fiber over build. Depth requirements are 8 inches minimum. Drop lengths average from 40ft -250 ft. We do have to temp house drop with coax if we cut there existing drops , but they are all located as well . You can call or text Brandon @ or to discuss moving forward . Simple hire process .

Contact

Brandon 318-594-2358 or 985-335-8289

Please Login to use the Contact form.

listed • expires
job listing #129618 • tiny link cabl.co/eHSM