By: Martin Walker ( (-REDACTED-) )
I need a subcontract designer with Focus 95 to do 30 miles/week of 15-80 homes/mile upgrade design using GI equipment. This is long term- we have about 3000 miles still to design. Contact (-REDACTED-) .
Subcontract design wanted
There are 0 replies to this message