The power mapping job is a complete inventory. No pole loading is required. The project includes as-built of all underground equipment as well. The personnel will need to have someone qualified (certifed) to work on high voltage.
In addition a +/- 1 meter GPS reading is required at every field point, aerial and UG. Lastly a demonstrable history of power as-built/inventory requires at least three verifiable references of past or current power projects. Thanks for the many responses for the last post.
Update on Power Mapping Bid
There are 0 replies to this message