Create your free account now! Sign up

Re:NEED 50 PEOPLE FOR MDU PROJECT IN DAYTON OHIO



IF I WAS LOOKING FOE EMPLOYEES I WOULD; CONTRACTORS HOWEVER WOULD NOT BE IN-HOUSE. THIS IS A SITE FOR CONTRACT POSTINGS,
A PLACE WHERE IF YOU HAVE WORK THAT NEEDS DONE, AND YOU ARE FAIR AND WILLING TO TREAT PEOPLE WELL, YOU POST WHAT YOU HAVE AND SEE WHO WHANTS THE WORK.
SOME OF THE PEOPLE ON HERE WHINE ABOUT PRICES BUT ARE THE ONES WHO HAVE DRIVEN THE RATES TO WHERE THEY ARE FROM POOR QUALITY WORKMANSHIP. I HAVE BEEN DOING THIS FOR 16 YEARS AND HAVE SEEN GOOD AND BAD RIGHT NOW THINGS ARE TIGHT BUT RATHER THAN COMPLAIN I WORK MY CONTRACTORS WORK AND WE MAKE SOME $ DOING IT. I TREAT ALL MY CONTRACTORS LIKE THEY SHOULD BE I TREAT THEM WITH RESPECT AND HONESTY. MOST OF THEM KNOW WHAT I GET PAID AND WHAT I PAY OUT. SO COMPLAIN SOMEWHERE ELSE. WE DONT BOTHER WITH SOAP OPERAS JUST WORK TO FEED OUR FAMILIES.

>
>you need to put this on in house jobs your price list is not from the prime
>
>>I NEED 50 QUALITY PEOPLE FOR A LONG TERM PROJECT IN DAYTON OHIO. PROJECT EXPECTED TO LAST ANOTHER YEAR. AVE. PAY IS 1500 TO 2200 A WEEK PAY IS TWO WEEKS OUT FROM INVOICE SO IT WILL BE THREE WEEKS B4 THE FIRST CHECK THEN A CHECK EVERY WEEK. PAY RAISE AFTER 90 DAYS NO RETAINAGE. 100% Q.C. WORK READY NOW
>>CALL 678-794-2991. EMAIL ME AT (-REDACTED-)
>>
>>PRICES AS FOLLOWS:Post wire to point of entry $13.50
>>Install RG-6 House drops from pole to building up to 100' $15.75
>>Install RG-6 House drops each additional foot over 100' $0.16
>>Ground Blocks $3.00
>>Trench (24" depth) $1.25
>>Install New Drop Fittings $0.68
>>Install Drop Splitters $0.75
>>Extend Drops On building (to 10') $3.38
>>Install Moldings on building (to 2") $0.68
>>Rework molding on building (to 2") $0.68
>>Rework Metal moldings (to 2") $1.13
>>Splice System amplifier $81.00
>>Splice System Line Extender $64.50
>>Splice Passive Splitting Device $24.75
>>Splice Directional Tap $10.13
>>Straight Splice $10.13
>>Install VGR or Ground Rod $12.60
>>Install Small LockBox (drop Splitters) $20.25
>>Install Medium Lockbox $24.75
>>Install Large Lockbox $46.88
>>Repair / Replace Lockbox Cover
>>Install Tom Ped $93.75
>>Install Large Pedestal $24.75
>>Install Medium Pedestal $9.90
>>Install Small Pedestal $6.75
>>Remove Replace Small Pedestal $9.00
>>Remove Replace Medium Pedestal $12.15
>>Remove Replace Large Pedestal $29.25
>>Install Self Support Feeder $0.68
>>Building Attachment Brackets $5.40
>>Core Drill Hole (by diameter in inches) $2.70
>>Wreckout Aerial Drops $0.56
>>Wreckout Pedestal $3.38
>>Wreckout Small Lockbox $5.40
>>Wreckout Medium Lockbox $8.10
>>Wreckout Large Lockbox $9.90
>>Wreckout Taps $1.35
>>Wreckout LE/Splitter/DC $2.70
>>Wreckout Trunk Amp $4.05
>>Wreckout Aerial Self Support Feeder $1.01
>>Additional items/Hourly Installer/Technician $11.25
>>
>>
>>
>>
This is CABL.com posting #54434. Tiny Link: cabl.co/moj8
Posted in reply to: Re:NEED 50 PEOPLE FOR MDU PROJECT IN DAYTON OHIO by cabledog52
There is 1 reply to this message
Re:NEED 50 PEOPLE FOR MDU PROJECT IN DAYTON OHIO wireguy 11/16/2001 10:06:00 AM