Here are the prices
Post wire to point of entry $13.50
Install RG-6 House drops from pole to building up to 100' $15.75
Install RG-6 House drops each additional foot over 100' $0.16
Ground Blocks $3.00
Trench (24" depth) $1.25
Install New Drop Fittings $0.68
Install Drop Splitters $0.75
Extend Drops On building (to 10') $3.38
Install Moldings on building (to 2") $0.68
Rework molding on building (to 2") $0.68
Rework Metal moldings (to 2") $1.13
Splice System amplifier $81.00
Splice System Line Extender $64.50
Splice Passive Splitting Device $24.75
Splice Directional Tap $10.13
Straight Splice $10.13
Install VGR or Ground Rod $12.60
Install Small LockBox (drop Splitters) $20.25
Install Medium Lockbox $24.75
Install Large Lockbox $46.88
Repair / Replace Lockbox Cover
Install Tom Ped $93.75
Install Large Pedestal $24.75
Install Medium Pedestal $9.90
Install Small Pedestal $6.75
Remove Replace Small Pedestal $9.00
Remove Replace Medium Pedestal $12.15
Remove Replace Large Pedestal $29.25
Install Self Support Feeder $0.68
Building Attachment Brackets $5.40
Core Drill Hole (by diameter in inches) $2.70
Wreckout RG 6/ RG11 input lines $0.56
Wreckout Pedestal $3.38
Wreckout Small Lockbox $5.40
Wreckout Medium Lockbox $8.10
Wreckout Large Lockbox $9.90
Wreckout Taps $1.35
Wreckout LE/Splitter/DC $2.70
Wreckout Trunk Amp $4.05
Wreckout Aerial Self Support Feeder $1.01
Additional items/Hourly Installer/Technician $11.25
>I NEED SEVERAL CREWS IN OHIO TO WORK ON A LONG TERM MDU PROJECT. AVERAGE PAY IS 1200.00 TO 2000.00 A WEEK. PLENTY OF WORK TO GO AROUND. PLEASE RESPOND IF YOU DO QUALITY WORK AND WANT TO STAY WORKING FOR THE NEXT YEAR OR MORE. HOTEL PAID FOR THE FIRST TWO WEEKS. CALL 678-794-2991 JACK GARRETT
>
Re:MDU WORK IN OHIO
There are 0 replies to this message