Create your free account now! Sign up

MDU WORK IN DAYTON OHIO


NEED GOOD CREWS TO START WORK AS SOON AS NEXT WEEK.
5 DAY WORK WEEK DAILY QC INSPECTIONS
NO RETAINAGE
THERE WERE SOME PROBLEMS IN DAYTON THOSE ARE GONE NOW
IF YOU WANT TO WORK EVERYDAY AND MAKE A GOOD AMOUNT OF MONEY PLEASE LET ME KNOW.
THERE ARE GOOD JOBS AND THERE ARE THOSE THAT ARE NOT SO GOOD.
THIS ONE WILL BE ONE THAT WILL BE A GOOD ONE.

HERE ARE THE RATES: THESE ARE BASE RATES RAISE AFTER 90 DAYS
Post wire to point of entry $13.50
Install RG-6 House drops from pole to building up to 100' $15.75
Install RG-6 House drops each additional foot over 100' $0.16
Ground Blocks $3.00
Trench (24" depth) $1.25
Install New Drop Fittings $0.68
Install Drop Splitters $0.75
Extend Drops On building (to 10') $3.38
Install Moldings on building (to 2") $0.68
Rework molding on building (to 2") $0.68
Rework Metal moldings (to 2") $1.13
Splice System amplifier $81.00
Splice System Line Extender $64.50
Splice Passive Splitting Device $24.75
Splice Directional Tap $10.13
Straight Splice $10.13
Install VGR or Ground Rod $12.60
Install Small LockBox (drop Splitters) $20.25
Install Medium Lockbox $24.75
Install Large Lockbox $46.88
Repair / Replace Lockbox Cover
Install Tom Ped $93.75
Install Large Pedestal $24.75
Install Medium Pedestal $9.90
Install Small Pedestal $6.75
Remove Replace Small Pedestal $9.00
Remove Replace Medium Pedestal $12.15
Remove Replace Large Pedestal $29.25
Install Self Support Feeder $0.68
Building Attachment Brackets $5.40
Core Drill Hole (by diameter in inches) $2.70
Wreckout Aerial Drops $0.56
Wreckout Pedestal $3.38
Wreckout Small Lockbox $5.40
Wreckout Medium Lockbox $8.10
Wreckout Large Lockbox $9.90
Wreckout Taps $1.35
Wreckout LE/Splitter/DC $2.70
Wreckout Trunk Amp $4.05
Wreckout Aerial Self Support Feeder $1.01
Additional items/Hourly Installer/Technician $11.25


CALL ME 678-794-2991
EMAIL ME (-REDACTED-)



This is CABL.com posting #53678. Tiny Link: cabl.co/mn7W
There are 0 replies to this message