Re:just a little help
Member #: 4638
Registered: 1996-2001
Posted:
47
Name:
Hoss Olson
Name:
Hoss Olson
Company:
Prince Telecom
Occupation:
VP of Operations Central District
Location:
302.275.8094
Personal:
Experience:
~30 years
>this may help you get the best price for sub work in oklahoma
>Channel Communications Master Prices List
>LINE ITEMS PRICE
>101. INSTALL STRAND (1/4) AND POLE LINE HARDWARE .30 FT
>102. INSTALL STRAND (5/16) AND POLE LINE HARWARE .32 FT
>103. REFRAME POLE 15.00 EA.
>104. INSTALL BUST ANCHOR 35.00 EA.
>105. INSTALL SCREW ANCHOR 25.00 EA.
>106. INSTALL DOWN GUY GUY (1/4" & / & 5/16") 10.00 EA.
>107. INSTALL SIDEWALK GUY ATTACHMENT 25.00EA.
>108. PLACE SINGLE COAXIAL CABLE COAXIAL CABLE .35 FT.
>109. PLACE MULITPLE COAXIAL CABLES (UP TO 3) ON EX. STR. .43 FT ON EXISTING STRAND .43 FT.
>110. TREE TRIMMING .25 FT.
>111. REPLACE BAD CABLE SINGLE .70 FT.
>112. REPLACE BAD CABLE MULTIPLE ACE BAD CABLE MULTIPLE .80 FT.
>113. REPLACE BAD CABLE MULTIPLE WITH FIBER 1.75 FT.
>114.INSTALL TREE GUARDS 2.00 EA.
>115. INSTALL EXTENSION ARM METAL FIBER CABLE METAL,FIBER GLASS, OR WOOD 10.00EA. S, OR WOOD 10.00 EA.
>116. INSTALL VERTICAL AND GROUND 20.00 EA.
>117. INSTALL BOND (INCLUDES ISOLATION AND BOND BELL) 5.00 EA.
>118. DE-LASH .30 FT.
>119. DELASH RE-LASH TO ADD NEW CABLE OR REPLACE .55 FT.
>120. WRECK OUT AERIAL CABLE ON EXISTING STRAND .15 FT.
>121. DELASH RE-LASH TO REPAIR BROKEN LASH .48 FT.
>122. DOUBLE LASH .05 FT.
>123. OVERLASH FIBER CABLE .65 FT.
>124. INSTALL STORAGE LOOP/SPLICE TAILS
> (ALL STOR, LOOPS &SPL LOC. USE SNOWSHOES) 90.00 EA.
>125.SET UP FEE 100.00 EA.
>126. EMERGENCY SET UP FEE 300.00 EA.
>127. FREEWAY CROSSING 500.00 EA.
>128. WRECK OUT AERIAL PLANT .18 FT.
>129. RE SAG .30 FT.
>130. RELOCATE MID SPAN DROP 25.00 EA.
>
>
>
>
>
>SPLICING LINE ITEMS
>201. SPLICE PLANT .35 FT.
>202. ACTIVATE & BALANCE .07 FT.
>203. SLPICE PLANT NO ACTIVATION .28 FT.
>204. NIGHT SPLICING FEE 100.00 EA.
>205. R&R AMPLIFIER 85.00 EA.
>206. R&R EXTENDER 65.00 EA.
>207. R&R SPLIT COUPLER 35.00 EA.
>208. R&R DIRECTIONAL TAP/LINE EQUALIZER 12.50 EA.
>209. ADD/REPLACE SPLICE10.00 EA. SPLICE 10.00 EA.
>210. FACEPLATE TAP, SPLITTER/DC COUPLER 10.00 EA.
>211. SWEEP & PROOF (NEW BUILD PLANT) .18 FT.
>212. SWEEP AND PROOF (R&M PLANT) .25 FT.
>
>
This is CABL.com posting #39765. Tiny Link: cabl.co/mkvx
Posted in reply to: just a little help by fuchannel
There are 0 replies to this message