Says Who?????? I believe the word is SHOULD, you can do anything doesnt means it right but you can. There are clowns out there drilling with less ground cover than that. Ripped through a 2" with a 432ct FOC cutting a sidewalk. CANT does not exisit only the right way and the wrong. 12" of cover = WRONG WAY, heaved driveways, roads, sidewalk etc etc... Enjoy your repairs
Re: What's a good rate for Missile Work
There is 1 reply to this message