in the 80s if we didn't do 5000 feet of strand a day we were sent packing. And we climbed everything back then. As far as fiber I don't rember what I was running
Re: Aerial Construction in Oregon
There is 1 reply to this message
in the 80s if we didn't do 5000 feet of strand a day we were sent packing. And we climbed everything back then. As far as fiber I don't rember what I was running