After reviewing the price list I've realized that the money isn't to be made in the wreck out. The de/re fiber is where it's at. I'm attempting to renegotiate the wreck out price with the prime but can promise nothing at this time. The prices are as follows for the aerial construction.Code Description Labor Rate
C39 Install Vertical Ground 9.00
C41 Downguy/Guard Exist Anchor 6.50
C42 Downguy/Guard Anchor 14.00
C43 Sidewalk Guy/Guard/Anchor 31.50
C44 Remove Downguy/Anchor 10.00
C45 Guy Guard Only 1.50
C46 Tree Guard Only 1.50
C48 Retention Span Only 15.00
C49 Pole Transfer 18.00
C50 Reframe Pole 12.50
C55 Double Lash Single Coax/Copper Cable 0.20/ft
C55A Double Lash Single Fiber 0.25/ft
C55B Each Additional Dble Lash Fbr/Coax/Copper 0.20/ft
C56 Delash/Relash 0.27/ft
C58 Relash Existing Cable 0.22/ft
C59 Wreck Out Overhead Network 0.08/ft