There was a shut down in Raleigh and Atlanta but Bechtel is still there unfortunately. There would be more production and better moral by the crews if they didn't make them reset vaults 4 or 5 times because 3 different people measured a 1/2" out of spec. Mainly because of a Construction Manual created by a 22-year old fresh out of college.
This is CABL.com posting #371637. Tiny Link: cabl.co/mbIQj