Re: Make ready


That is an accurate statement.  

Poles loading is measurements of all conductors primary on down, angles of conductors, wire sizes, etc. and takes much more time per pole to complete compared to a make ready survey which is typically measuring lowest power conductor down thru all the communications cables.


Take Care
Chris Kramer
Spectrum Planning Inc.
This is CABL.com posting #371321. Tiny Link: cabl.co/mbILd
Posted in reply to: Re: Make ready by ken-Ollie-ulrich
There is 1 reply to this message
Re: Make ready tucstr 10/17/2016 5:52:07 PM