It will depend on the "Specs" for the project! Look at it in terms of data points (that is really what mapping is), the more information you pick up, the more it pays. There is a "Strand Rate", there is an "Asbuilt Rate" and there is (generally) a "Fiber Rate". When refering to Field Engineering as a whole, there is also "Make-Ready", "Fiber Routing" and "MDU Design" that belong in this catagory.
Hope this helps!
Re: Field Engineering / Walkout
There is 1 reply to this message