That is where it should be!
IF there are QC problems there SHOULD have been a do over list with a completion date.
LIKEWISE, short or late checks should be presented for adjustment.
THEN the final check is presented. IF it bounces that is a seperate crime. Then equipment inventory is presented and checked. Both parties hug (optional) and march in seperate directions.
Joe
Re: What to do when a tech holds equipment for ran
Member #: 66409
Registered: 2/26/2009
Posted:
991
Name:
joe diamond
Name:
Joe Diamond
Company:
phone & dtv contractor
Occupation:
installer
Location:
east MD
Personal:
late 70s
Experience:
~33 years
joe
This is CABL.com posting #359461. Tiny Link: cabl.co/mbFFV
Posted in reply to: Re: What to do when a tech holds equipment for ran by massive coax
There are 0 replies to this message