NEC codes are first, tenth, and last. Also before and after each active depending what system you work.
I work here in the midwest and Ameren is the electric company in most places where we work. they are getting to the point that they want us to have a bond or our own verticle where they have one. Never bond to Braided Electric verticles and Power Supplies get their own ground rod and verticle. Bottom line is like always check with the MSO to see what they want.