Create your free account now! Sign up

Re: Cable industry standards for grounding plant?


NEC codes are first, tenth, and last. Also before and after each active depending what system you work.
I work here in the midwest and Ameren is the electric company in most places where we work. they are getting to the point that they want us to have a bond or our own verticle where they have one. Never bond to Braided Electric verticles and Power Supplies get their own ground rod and verticle. Bottom line is like always check with the MSO to see what they want.
This is CABL.com posting #353226. Tiny Link: cabl.co/mbD3m
Posted in reply to: Cable industry standards for grounding plant? by cablon
There are 0 replies to this message