94,680' approximately with a single cable in an abandoned pipeline going from Port Fouchon Louisiana out into the Gulf. There is a board with a copper plate stating such record at the landing site off of HWY1. I was the Engineer on the project. Cable was pumped using an oil pipeline pig and floated with water instead of air. Worked perfectly twice (we did a smaller distance in Texas) for the FiberWeb Project now owned by BP.
Re: Fiber Blowing....longest single span.
There are 4 replies to this message