i went to a job custmer dug 2 feet down 150 ft for a clear line of site i got the photo's i put in a 29 volt no probelm yet plus the wire in the trailer (dtv cut everything to be safe) this job was reschedule 9 times before i got there
This is CABL.com posting #327582. Tiny Link: cabl.co/mbxnK