this is NOT for Gtech,this is a sgi project.Sgi pays better be cause shit work is not allowed.No run and gun on these.mounts are for a 1.2. that is a 12-16 block mount.If you have to pick up and return old gear also,where are you going to put it?How many can you load for two? that means two jobs a day,do the math.those little dtv vans are not going to work.good luck getting a CDMA to work in the sticks.I did the first roll out years ago,had a tough time getting block in small towns.
This is CABL.com posting #324807. Tiny Link: cabl.co/mbwEZ