Yea, I've built both ways: Some systems have expansion loops at taps, some don't. I always get the specifications for every damn thing. I had a system that made me put an expansion loop before every terminating tap. Go figure. They pay for what they want.
This is CABL.com posting #313161. Tiny Link: cabl.co/mbtC9