About a full day to tear everything down and seperate. Then about 8 full size truck loads to get rid of it all. Did get about 75 bucks for dirty aluminam. Not enough copper to make anything. Right now I am beefing up the frame somemore to handle 2X8X18 plus side walls. Thank god for mig welders.
This is CABL.com posting #299699. Tiny Link: cabl.co/mbp71