Ten istalls and on time goals. 1st job run new A/O for TV. Got to the house 1st job ! Nine more jobs to go. The crawl space was wet with at least 6 inches of water. The customer did not want to hear that the tech could come back later and make the job the last of the day. So the 64 year women got her ass into the crawl space ro fatch the other end of the cable. Thank god the spliter was at the crawl space opening. Now that I think about it we will need some help so I should called the old lady and offer her a job....
rlhcable
This is CABL.com posting #288724. Tiny Link: cabl.co/mbng0