concrete takes hours to set up. to get around this, get a pole slammer and drive the pole in 12-16" in the ground.use the base from the wall/roof mount as anti-sway.This will keep the pole straight and level as the concrete cures.
This is CABL.com posting #283767. Tiny Link: cabl.co/mblY3