Colorado Price Schedule…ending 12, 2007.
Aerial Place aerial new build (2 cables) 1.00 ft.
“ Replace coax (1 cable) 1.00 ft.
“ Each additional cable 0.35 ft.
“ W/O old coax when replacing new 0.32 ft.
“ W/O aerial separate trip 0.18 ft.
“ Reframe straight through pole 40.00 ea.
“ Reframe dead end pole 50.00 ea.
“ Reframe junction pole 50.00 ea.
“ Place down guy 25.00 ea.
“ Place screw anchor 45.00 ea.
“ Install anchor in concrete 75.00 ea.
“ Install VGR 27.00 ea.
“ Install extension arm 15.00 ea.
“ Install sidewalk guy arm 15.00 ea.
“ Install rock anchor 95.00 ea.
“ Delash & relash fiber to existing cable 1.00 ft.
“ Delash & relash broken lashing wire 1.00 ft.
“ Attach self support to bldg. 1.20 ft.
“ Install aerial strand 0.49 ft.
“ Tree trimming 0.17 ft.
Fiber Spl. 1-12 33.25 ea.
13-48 33.25 ea.
49-72 33.25 ea.
73-144 33.25 ea.
145-216 33.25 ea.
217-188 33.25 ea.
289 and above 33.25 ea.
Hourly
2 man crew (OT) 100.00 hr.
3 man crew (OT) 50.00 hr.
2 man crew (regular hours) 90.00 hr.
3 man crew (regular hours) 120.00 hr.
Backhoe (OT) 92.50 hr.
Backhoe regular time 75.00 hr.
Supervisor 50.00 hr.
Supervisor (OT) 65.00 hr.
Fiber splicer 80.00 hr.
Fiber splicer (OT) 120.00 hr.
Splicer 45.00 hr.
Splicer (OT) 67.50 hr.
Warehouse man 45.00 hr.
Warehouse man (OT) 67.50 hr.
Joint trench One 2” CIC 1.20 ft.
Each additional 2” CIC 0.20 ft.
One 4” conduit 0.85 ft.
Each additional 4” conduit 0.25 ft.
Install vault 75.00 ea.
Place drop duct from tap to home 150.00 ea.
MDU: Pre-wire 30.00 drop
Post-wire 40.00 drop
Pre-wire with molding 40.00 drop
Post wire with molding 50.00 drop
Post wire re-work 15.00 drop
Post wire wreck out 6.00 drop
Wall fish 35.00 ea.
Install wall plate 2.00 ea.
TV jumper 2.00 ea.
Cut tag and ohm drop 2.50 ea.
Pre-wire inside unit 14.00 drop
Pre-wire home run 20.00 drop
Pre-wire additional home run 17.00 drop
Trim 2.00 ea.
Trap drop 2.00 ea.
Core drill 125.00 ea.
Install molding 0.75 ft.
Wreck out molding 0.15 ft.
Bury drop, min. 6” in conduit 150.00 ea.
Drop extension 2.00 ea.
Post wire re-work 5.00 ea.
X-Ray floors Cost +
Place 1” EMT with materials 11.50 ft.
Joint Laterials:Joint trenching 56.00 ft.
Additional footage 0.56 ft.
OPE installation 10.00 ea.
Place fiber: Lash first aerial fiber cable 1.00 ft.
Lash additional fiber cable 0.42 ft.
Delash relash when chasing slack 0.95 ft.
Place fiber in open duct 1.00 ft.
Place fiber in occupied duct 1.00 ft.
Install snow shoe 15.00 ea.
Place fiber enclosure 250.00 ea.
Re-enter enclosure 185.00 ea.
Optimize node 125.00 ea.
Power supply: Install PS aerial 1280.00 ea.
Install PS underground 1380.00 ea.
Wreck out PS aerial 125.00 ea
Wreck out PS UG 125.00 ea.
Change out module 75.00 ea.
Splice/Activate Splice UG plant output footage 0.45 ft.
Activate UG plant output footage 0.08 ft.
Splice aerial plant output footage 0.45 ft.
Activate aerial plant output footage 0.08 ft.
Sweep & cert. Sweep & certify plant 0.28 ft.
Underground: Dir. Bore set up less than 100’ 250.00 ea.
New build 24” Tr. 10.50 ft.
New build 30” Tr. 11.00 ft.
New build 36” Tr. 11.50 ft.
New build 48” Tr. 14.00 ft.
Maint. 24” Tr. 12.50 ft.
Maint. 30” Tr. 13.00 ft.
Maint. 36” Tr. 13.50 ft.
Maint. 48” Tr. 15.00 ft.
Abnormal soil adder 3.00 ft.
ROW haul material 18.00 ton
Haul road base, spread, repack Cost +
Dig up expose conduit 24” 175.00 ea.
Rod and rope existing duct 0.40 ft.
Install tap ped. 18.00 ea.
Install splitter ped. 22.00 ea.
Install LE/Amp Ped. 60.00 ea.
Install large vault 200.00 ea.
Install manhole 4x4x4 650.00 ea.
Direct. Bore up to 2-2” conduits 17.00 ft.
Direct. Bore each additional 2” 0.20 ft.
Direct. Bore 1-4” steel pipe with material 30.00 ft.
Direct. Bore add. 4” steel pipe 15.00 ft.
Direct. Bore 1-2” steel with material 26.50 ft.
Direct. Bore additional 2” steel 0.40 ft.
Vacuum Pothole hard surface 200.00 ea.
Pothole, locate, hard surface 150.00 ea.
Pothole hard surface/infrared 500.00 ea.
Pull maxcell 0.35 ft.
Repair conduit 45.00 ea.
Remove vault 150.00 ea.
Place up to 2 coax ca. in occupied conduit 1.25 ft.
Place up to 2 coax ca. in clear duct 1.10 ft.
R&R asphalt 18.00 sf.
R&R concrete 22.00 sf.
Engineer drawings for permit cost +
Install riser 80.00 ea.
Standard 2” core drill 125.00 ea.
Flow fill Cost +
Permit coordinator Cost + trip
Asphalt R&R Minimum charge 525.00 Loc.
Concrete R&R Minimum charge 735.00 Loc.