The Contractor are not bad, but the Technicians to accepted such ridiculus rate. I hope one day Technicians in Florida wake up and think for a second maybe those ripped off Contractor and Mastec will change their Rates.
This is CABL.com posting #268430. Tiny Link: cabl.co/mbhZG