Top..did a lot of Cali. work, LA, SF, Daly City, Oakland, in Telco and cable, you can about double the labor cost for hanging strand..It's a pain in the butt..you have NEC, NESC, OSHA, GO-95, + LA has a code stacked on top of GO-95, guard arms on every pole..Crimp DG tails, no weavers used..Crimping tool was 200$..usually work with a Telco inspector with pole attachment sheets attached to every print with pole #'s for attachment height..inspector on every crew..pole lead goes back, you use stand off arms to keep the strand straight until the pole lead comes back in lead..traffic control is a bitch..had to hire local traffic control company with every crew..At the end of the day the money aint that good..Calli. has broke a lot of contractors that go there expecting to make a fortune..be carefull. Sorry for the book. Forgot to say, some towns have stepped pole, can't use hooks and if ya do they replace the pole and charge you for it..
This is CABL.com posting #245319. Tiny Link: cabl.co/mbbYV
Posted in reply to: Re: Strand question by topdawg43
There are 0 replies to this message