Funny story about them; I was in-house with TWC during the Orange County 1GHz project, WB was working in a node ped. when they left, the ped. it caught on fire. Obviously they were not careful when the torched the shrink. lol It burned everything in the ped. up pretty good. The bad thing was that they drove away and didn't know. I believe CableCom responded. That wasn't the reason they got kicked off the project but it didn't help.
This is CABL.com posting #245247. Tiny Link: cabl.co/mbbXL