I can vouch for this one. It worked every time I have done it. I was not pulling drops but 2 men doing strand and cable/fiber.. if strand I already have pole prepped with hoist to suck up, if cable shut them down pull the jig and go lash.. If drops when in doubt coneman the barbarian will shut them down every time. Work fast and safe..
Re: Keeping tension on aerial drop while replacing
There is 1 reply to this message