"to the breaker box in the basement"
Against NEC directive...You are taking a ground into a structure when it is to be on the outside...
Service loop on the input but none on the output...
Ground wire entering thru same holeas service drop...
Rokas/cable clips not spaced correctly...
I won't even comment on the RV pics...
You fail QC and have 24hrs to correct or will be charged back the cost of the time and materials to meet spec...Have a nice day...
Re: standard dtv install
There are 3 replies to this message