Create your free account now! Sign up

Re: Work Done By Baileys Satellite


I utilized the level on the mount itself, thinking this is cool. Don't ever do that, when I got the thing up there and just barely touched the level is was not tight at all..I could make anything level with that thing. Now it may be 1/128th off but not any 1/64th..(sunny)
This is CABL.com posting #211364. Tiny Link: cabl.co/m29g
Posted in reply to: Re: Work Done By Baileys Satellite by 1brikshyvtwin
There is 1 reply to this message
Re: Work Done By Baileys Satellite IslandCableDog 2/17/2008 11:59:00 AM