True story Triple. I did an install in Dallas, Texas in '84. This was back in the day when you got a monthly additional charge for each outlet past the first. This lady was about 7-8 months along in her pregnancy. I finished the one outlet install and was about to leave. She asked me to make her a 70' jumper in case she had company and wanted to run the only MBR line out to the living room. The cable co. had and 8' foot jumper rule so I refused and she called the Cable Co after I left. The next day the contractor told me that she had gotten me fired. The contracting Co. sent me to another system so I didn't lose my job.
All I had in mind was her walking down the hallway tripping over the cable and her and the baby getting hurt.
Re: Curious
There are 0 replies to this message