This has also been tried on the Telephone side. (twisted pair) I can remember way back when GTE tried this. Last man on the pole was responsible to spec everything. Needless to say, I and all the other contractors told GTE to hop up the chute. (Durham, NC)
This is CABL.com posting #190028. Tiny Link: cabl.co/mXA8