Usually
1. Bond to power and phone, per normal.
2. you run a vertical down the pole to a freshly driven ground rod.
3. Some specs are now calling out that the ground be tested to confirm quality of ground, usually 25 ohms or less.
Process repeated at the pole after the active .
Re: bonding
There are 0 replies to this message