We RA a ton of the DPP Twins this last spring and summer and expect the same next. Very frustrating from a managment stand point when telling techs we need to reduce return trips and they brng back LNBs that were install less than a 7 days. Don't get me started on the payment problem with dish and these less than 12 day TC.
This is CABL.com posting #180317. Tiny Link: cabl.co/mU4v