If This Is For The Verizon Work It Does Pay Good And On Time. If Underground You Will Need What Is Known As An Airknife To Uncover Locates, No Digging With Shovel Or Backhoe When I Was There. Even Directional Bores Had To Be Airknifed. If Working For Fiber Cable Construction, Jr Is A Great Guy But He Will Ride You To Get Work Done. His Partner Chris Is Also Im Told A Great Guy But I Don't Know Him And Never Meet Him. Underground You Will Need 6 To 10 Men To Really Make Head Way.
This is CABL.com posting #175985. Tiny Link: cabl.co/mTWD